πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms

OCTARY USA Β· SOLAR FARMS

North Carolina El Member Corp: solar farms in the USA

Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating13plants
Operating capacity23.5 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

13 plants
PlantCapacityStageStateOwner / operatorYear
Arba Solar Energy Storage 5.0 MW Operating NC
Greene
North Carolina El Member Corp 2023
Freight Line Solar, LLC 2.0 MW Operating NC
Duplin
North Carolina El Member Corp 2020
Hall Solar Energy Storage 2.0 MW Operating NC
Duplin
North Carolina El Member Corp 2022
Holly Swamp Solar, LLC 2.0 MW Operating NC
Robeson
North Carolina El Member Corp 2020
Lowe Solar Energy Storage 2.0 MW Operating NC
Randolph
North Carolina El Member Corp 2022
Ludie Brown Solar Energy Storage 2.0 MW Operating NC
Duplin
North Carolina El Member Corp 2022
PG Solar, LLC 2.0 MW Operating NC
Duplin
North Carolina El Member Corp 2020
Rose Acre Solar Energy Storage 2.0 MW Operating NC
Hyde
North Carolina El Member Corp 2023
Spencer Meadow Solar Energy Storage 2.0 MW Operating NC
Randolph
North Carolina El Member Corp 2022
Old Cedar Solar Energy Storage 1.0 MW Operating NC
Randolph
North Carolina El Member Corp 2021
Hamlet Solar Energy Storage 0.5 MW Operating NC
Richmond
North Carolina El Member Corp 2023
South River H4 Solar Energy Storage 0.5 MW Operating NC
Sampson
North Carolina El Member Corp 2023
Wake RJ3 Solar Energy Storage 0.5 MW Operating NC
Wake
North Carolina El Member Corp 2023

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map