United States › Power plants › Oil-fired power plants › Florida
OIL-FIRED POWER PLANTSUnknown
Unknown is a 1,560 MW cancelled oil-fired power plant in Hardee County, Florida, operated by Seminole Electric Cooperative Inc.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Petroleum Liquids | 300 MW | Cancelled or postponed |
| GT1 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT2 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT3 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT4 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT5 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT6 | Petroleum Liquids | 180 MW | Cancelled or postponed |
| GT7 | Petroleum Liquids | 180 MW | Cancelled or postponed |
Plant details
- Operator
- Seminole Electric Cooperative Inc
- Location
- Hardee County, Florida
- Sector
- Electric Utility
- Capacity
- Cancelled: 1,560 MW
- EIA plant ID
- 7738
Location
27.6278, -81.8450
Nearby power plants
- Fort Green Solar Power PlantSolar farms · 74.9 MW · 6.0 mi
- Midulla Generating StationGas power plants · 853 MW · 7.3 mi
- Hardee Power StationGas power plants · 470 MW · 7.3 mi
- Payne Creek SolarSolar farms · 70.3 MW · 7.7 mi
- Tiger BayGas power plants · 278 MW · 8.2 mi
- Vandolah Power StationGas power plants · 728 MW · 8.7 mi
- Brewster SolarSolar farms · 40.0 MW · 10.6 mi
- Mosaic South Pierce OperationsOther power plants · 38.0 MW · 11.1 mi
- Hines Energy ComplexGas power plants · 2,266 MW · 11.2 mi
- PolkGas power plants · 1,458 MW · 11.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem