United States › Power plants › Solar farms › Florida
SOLAR FARMSBrewster Solar
Brewster Solar is a 40.0 MW under construction solar farm in Polk County, Florida, operated by Tampa Electric Co.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Solar Photovoltaic | 40 MW | Under construction (over 50%) |
Plant details
- Operator
- Tampa Electric Co
- Location
- Polk County, Florida
- Balancing authority
- TEC
- Sector
- Electric Utility
- Capacity
- Under construction: 40.0 MW
- EIA plant ID
- 69522
Location
27.7419, -81.9619
Nearby power plants
- PolkGas power plants · 1,458 MW · 1.9 mi
- Mosaic South Pierce OperationsOther power plants · 38.0 MW · 2.1 mi
- DurranceSolar farms · 60.0 MW · 2.9 mi
- Alafia SolarSolar farms · 60.0 MW · 4.1 mi
- Jamison Solar (FL)Solar farms · 74.5 MW · 4.5 mi
- Lake Hancock SolarSolar farms · 49.5 MW · 4.7 mi
- Payne Creek SolarSolar farms · 70.3 MW · 5.3 mi
- Hines Energy ComplexGas power plants · 2,266 MW · 6.5 mi
- Tiger BayGas power plants · 278 MW · 6.9 mi
- Midulla Generating StationGas power plants · 853 MW · 6.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem