🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Hydroelectric plants › Washington

HYDROELECTRIC PLANTS

PEC Headworks

PEC Headworks is a 6.6 MW retired hydroelectric plant in Grant County, Washington, operated by Columbia Basin Hydropower.

Plant statusClosed
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 1990 (completed)
  5. ClosedDec 2025 (current stage)

Open in Google MapsMore hydroelectric plants in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Conventional Hydroelectric6.6 MW RetiredSep 1990Dec 2025

Plant details

Operator
Columbia Basin Hydropower
Location
Grant County, Washington
Balancing authority
GCPD
Sector
Electric Utility
Capacity
Retired: 6.6 MW
First unit online
Sep 1990
EIA plant ID
7113

Location

47.1596, -119.8963

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem