United States › Power plants › Hydroelectric plants › Washington
HYDROELECTRIC PLANTSWanapum
Wanapum is a 1,220 MW operating hydroelectric plant in Grant County, Washington, operated by PUD No 2 of Grant County - (WA).
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1A | Conventional Hydroelectric | 122 MW | |
| 2A | Conventional Hydroelectric | 122 MW | |
| 3A | Conventional Hydroelectric | 122 MW | |
| 4A | Conventional Hydroelectric | 122 MW | |
| 5A | Conventional Hydroelectric | 122 MW | |
| 6A | Conventional Hydroelectric | 122 MW | |
| 7A | Conventional Hydroelectric | 122 MW | |
| 8A | Conventional Hydroelectric | 122 MW | |
| 9A | Conventional Hydroelectric | 122 MW | |
| 10A | Conventional Hydroelectric | 122 MW | |
| 1 | Conventional Hydroelectric | 104 MW | Retired |
| 2 | Conventional Hydroelectric | 104 MW | Retired |
| 3 | Conventional Hydroelectric | 104 MW | Retired |
| 4 | Conventional Hydroelectric | 104 MW | Retired |
| 5 | Conventional Hydroelectric | 104 MW | Retired |
| 6 | Conventional Hydroelectric | 104 MW | Retired |
| 7 | Conventional Hydroelectric | 104 MW | Retired |
| 8 | Conventional Hydroelectric | 104 MW | Retired |
| 9 | Conventional Hydroelectric | 104 MW | Retired |
| 10 | Conventional Hydroelectric | 104 MW | Retired |
Plant details
- Operator
- PUD No 2 of Grant County - (WA)
- Location
- Grant County, Washington
- Balancing authority
- GCPD
- Sector
- Electric Utility
- Capacity
- Operating: 1,220 MW
Retired: 1,038 MW - First unit online
- Jun 1963
- EIA plant ID
- 3888
Location
46.8731, -119.9703
Nearby power plants
- Royal SlopeSolar farms, Battery storage · 520 MW · 2.4 mi
- Vantage Wind Energy LLCWind farms · 90.0 MW · 11.5 mi
- Wild HorseSolar farms, Wind farms · 273 MW · 15.8 mi
- Priest RapidsHydroelectric plants · 950 MW · 16.0 mi
- Ostrea Solar, LLCSolar farms · 80.0 MW · 23.8 mi
- High Top SolarSolar farms · 80.0 MW · 24.2 mi
- Penstemon Solar ProjectSolar farms · 5.0 MW · 26.1 mi
- Camas Solar ProjectSolar farms · 5.0 MW · 26.1 mi
- Goose Prairie SolarSolar farms · 80.0 MW · 27.0 mi
- RozaHydroelectric plants · 12.9 MW · 29.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem