United States › Power plants › Hydroelectric plants › Washington
HYDROELECTRIC PLANTSPriest Rapids
Priest Rapids is a 950 MW operating hydroelectric plant in Grant County, Washington, operated by PUD No 2 of Grant County - (WA).
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Conventional Hydroelectric | 95 MW | |
| 2 | Conventional Hydroelectric | 95 MW | |
| 3 | Conventional Hydroelectric | 95 MW | |
| 4 | Conventional Hydroelectric | 95 MW | |
| 5 | Conventional Hydroelectric | 95 MW | |
| 6 | Conventional Hydroelectric | 95 MW | |
| 7 | Conventional Hydroelectric | 95 MW | |
| 8 | Conventional Hydroelectric | 95 MW | |
| 9 | Conventional Hydroelectric | 95 MW | |
| 10 | Conventional Hydroelectric | 95 MW |
Plant details
- Operator
- PUD No 2 of Grant County - (WA)
- Location
- Grant County, Washington
- Balancing authority
- BPAT
- Sector
- Electric Utility
- Capacity
- Operating: 950 MW
- First unit online
- Oct 1959
- EIA plant ID
- 3887
Location
46.6451, -119.9080
Nearby power plants
- Ostrea Solar, LLCSolar farms · 80.0 MW · 8.7 mi
- High Top SolarSolar farms · 80.0 MW · 8.8 mi
- WanapumHydroelectric plants · 1,220 MW · 16.0 mi
- Royal SlopeSolar farms, Battery storage · 520 MW · 16.5 mi
- Goose Prairie SolarSolar farms · 80.0 MW · 17.7 mi
- Hop Hill Solar Generation and BESSSolar farms, Battery storage, Wind farms · 1,200 MW · 22.6 mi
- Vantage Wind Energy LLCWind farms · 90.0 MW · 25.0 mi
- RozaHydroelectric plants · 12.9 MW · 27.1 mi
- Saddle Mountain East Wind FarmWind farms · 126 MW · 28.4 mi
- Columbia Generating StationNuclear power plants · 1,200 MW · 29.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem