United States › Power plants › Solar farms › Virginia
SOLAR FARMSPetersburg - VA 0224 (Murphy)
Petersburg - VA 0224 (Murphy) is a 2.6 MW under construction solar farm in Chesterfield County, Virginia, operated by CVE US VA Petersburg 224 LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 224 | Solar Photovoltaic | 2.6 MW | Under construction (up to 50%) |
Plant details
- Operator
- CVE US VA Petersburg 224 LLC
- Location
- Chesterfield County, Virginia
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 2.6 MW
- EIA plant ID
- 70123
Location
37.2435, -77.4365
Nearby power plants
- BrasfieldHydroelectric plants · 2.9 MW · 5.1 mi
- Chester Solar Technology Park, LLCSolar farms · 160 MW · 5.3 mi
- Caden Energix Rives Road LLCSolar farms · 19.7 MW · 7.1 mi
- Chesterfield Landfill GasOil-fired power plants · 14.4 MW · 8.2 mi
- Hopewell MillBioenergy plants · 47.6 MW · 9.1 mi
- Hopewell CogenerationGas power plants · 399 MW · 9.2 mi
- Hopewell Power StationBioenergy plants · 71.1 MW · 9.2 mi
- ChesterfieldGas power plants · 1,447 MW · 10.0 mi
- Sebera SolarSolar farms · 18.0 MW · 10.3 mi
- Philip MorrisSolar farms · 2.0 MW · 10.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem