United States βΊ Power plants βΊ Battery storage βΊ Nevada
BATTERY STORAGE Β· SOLAR FARMSLibra Solar
Libra Solar is a 1,400 MW under construction power plant in Lyon County, Nevada, operated by Libra Solar LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| LBRBS | Batteries | 700 MW | Under construction (up to 50%) |
| LBRPV | Solar Photovoltaic | 700 MW | Under construction (up to 50%) |
Plant details
- Operator
- Libra Solar LLC
- Location
- Lyon County, Nevada
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 1,400 MW
- EIA plant ID
- 69857
Location
38.9021, -118.9614
Nearby power plants
- Fort ChurchillGas power plants Β· 230 MW Β· 18.1 mi
- Ft. Churchill PVSolar farms Β· 19.9 MW Β· 18.3 mi
- Whitegrass No. 1Geothermal plants Β· 6.4 MW Β· 21.5 mi
- Salt WellsGeothermal plants Β· 23.6 MW Β· 34.2 mi
- Don A Campbell 2 GeothermalGeothermal plants Β· 20.0 MW Β· 34.5 mi
- Don A Campbell 1 GeothermalGeothermal plants Β· 20.0 MW Β· 34.6 mi
- LahontanHydroelectric plants Β· 1.8 MW Β· 39.1 mi
- New LahontanHydroelectric plants Β· 4.0 MW Β· 39.2 mi
- WashoeHydroelectric plants Β· 2.6 MW Β· 42.4 mi
- FleishHydroelectric plants Β· 2.5 MW Β· 43.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem