United States βΊ Power plants βΊ Solar farms βΊ Nevada
SOLAR FARMSFt. Churchill PV
Ft. Churchill PV is a 19.9 MW operating solar farm in Lyon County, Nevada, operated by Sierra Pacific Power Co.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| NVC7 | Solar Photovoltaic | 20 MW |
Plant details
- Operator
- Sierra Pacific Power Co
- Location
- Lyon County, Nevada
- Balancing authority
- NEVP
- Sector
- Commercial Non-CHP
- Capacity
- Operating: 19.9 MW
- First unit online
- May 2015
- EIA plant ID
- 59472
Location
39.1281, -119.1400
Nearby power plants
- Fort ChurchillGas power plants Β· 230 MW Β· 0.4 mi
- Whitegrass No. 1Geothermal plants Β· 6.4 MW Β· 3.3 mi
- Libra SolarSolar farms, Battery storage Β· 1,400 MW Β· 18.3 mi
- LahontanHydroelectric plants Β· 1.8 MW Β· 23.4 mi
- New LahontanHydroelectric plants Β· 4.0 MW Β· 23.5 mi
- WashoeHydroelectric plants Β· 2.6 MW Β· 25.5 mi
- FleishHydroelectric plants Β· 2.5 MW Β· 26.6 mi
- VerdiHydroelectric plants Β· 2.4 MW Β· 27.0 mi
- Patua Acquisition Project, LLCGeothermal plants, Solar farms Β· 58.6 MW Β· 31.8 mi
- Salt WellsGeothermal plants Β· 23.6 MW Β· 32.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem