United States › Power plants › Solar farms › Connecticut
SOLAR FARMSWindsor Locks
Windsor Locks is a 1.8 MW under construction solar farm in Hartford County, Connecticut, operated by ENGIE Distributed Renewables Development LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| WNSRL | Solar Photovoltaic | 1.8 MW | Under construction (up to 50%) |
Plant details
- Operator
- ENGIE Distributed Renewables Development LLC
- Location
- Hartford County, Connecticut
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 1.8 MW
- EIA plant ID
- 69807
Location
41.9281, -72.6869
Nearby power plants
- Bradley Energy CenterGas power plants · 5.8 MW · 0.2 mi
- CT Airport Authority Solar OneSolar farms · 4.0 MW · 0.9 mi
- Rainbow (CT)Hydroelectric plants · 8.0 MW · 0.9 mi
- Algonquin Windsor LocksGas power plants · 71.0 MW · 3.2 mi
- Pepperidge Farm BloomfieldGas power plants · 2.6 MW · 4.4 mi
- Canis Major Solar FarmSolar farms · 2.0 MW · 5.9 mi
- ALDI DC 2Solar farms · 1.2 MW · 7.2 mi
- Goose Pond SolarSolar farms · 4.0 MW · 7.3 mi
- Kearsarge Southwick LLCSolar farms · 3.3 MW · 7.6 mi
- East Windsor Solar TwoSolar farms · 4.0 MW · 8.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem