United States › Power plants › Solar farms › Connecticut
SOLAR FARMSCT Airport Authority Solar One
CT Airport Authority Solar One is a 4.0 MW planned solar farm in Hartford County, Connecticut, operated by CAA CT Solar One, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| VCP16 | Solar Photovoltaic | 4.0 MW | Planned, approvals not yet sought |
Plant details
- Operator
- CAA CT Solar One, LLC
- Location
- Hartford County, Connecticut
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Planned: 4.0 MW
- EIA plant ID
- 65146
Location
41.9338, -72.6714
Nearby power plants
- Bradley Energy CenterGas power plants · 5.8 MW · 0.8 mi
- Rainbow (CT)Hydroelectric plants · 8.0 MW · 1.7 mi
- Algonquin Windsor LocksGas power plants · 71.0 MW · 2.5 mi
- Pepperidge Farm BloomfieldGas power plants · 2.6 MW · 5.1 mi
- Canis Major Solar FarmSolar farms · 2.0 MW · 5.3 mi
- ALDI DC 2Solar farms · 1.2 MW · 6.9 mi
- Goose Pond SolarSolar farms · 4.0 MW · 7.6 mi
- Kearsarge Southwick LLCSolar farms · 3.3 MW · 7.8 mi
- Berkshire PowerGas power plants · 289 MW · 8.0 mi
- Enfield Solar OneSolar farms · 4.0 MW · 8.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem