United States › Power plants › Solar farms › Nevada
SOLAR FARMSDry Lake East Energy Center
Dry Lake East Energy Center is a 200 MW under construction solar farm in Clark County, Nevada, operated by Dry Lake East Energy Center.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| DLE1 | Solar Photovoltaic | 200 MW | Under construction (over 50%) |
Plant details
- Operator
- Dry Lake East Energy Center
- Location
- Clark County, Nevada
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 200 MW
- EIA plant ID
- 69549
Location
36.4011, -114.8652
Nearby power plants
- Dry Lake Solar Energy CenterSolar farms, Battery storage · 250 MW · 2.3 mi
- Playa Solar 1, LLCSolar farms · 79.0 MW · 2.4 mi
- Playa Solar 2Solar farms · 100 MW · 2.4 mi
- Vitex StorageBattery storage · 300 MW · 2.8 mi
- Harry AllenGas power plants · 745 MW · 2.9 mi
- Republic Services Renewable Energy, LLCBioenergy plants · 12.0 MW · 3.0 mi
- Chuck Lenzie Generating StationGas power plants · 1,466 MW · 3.4 mi
- Arrow Canyon Solar HybridSolar farms, Battery storage · 275 MW · 4.2 mi
- Nevada Cogen Assoc#1 GarnetVlyGas power plants · 94.8 MW · 5.1 mi
- Harry Allen Solar Energy LLCSolar farms · 100 MW · 5.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem