United States › Power plants › Solar farms › Nevada
SOLAR FARMSPlaya Solar 2
Playa Solar 2 is a 100 MW operating solar farm in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc..
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Solar Photovoltaic | 100 MW |
Plant details
- Operator
- EDF Renewable Asset Holdings, Inc.
- Location
- Clark County, Nevada
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
- Capacity
- Operating: 100 MW
- First unit online
- Aug 2017
- EIA plant ID
- 60261
Location
36.4080, -114.9080
Nearby power plants
- Playa Solar 1, LLCSolar farms · 79.0 MW · 0.0 mi
- Harry AllenGas power plants · 745 MW · 1.6 mi
- Dry Lake Solar Energy CenterSolar farms, Battery storage · 250 MW · 1.6 mi
- Vitex StorageBattery storage · 300 MW · 1.8 mi
- Chuck Lenzie Generating StationGas power plants · 1,466 MW · 1.8 mi
- Dry Lake East Energy CenterSolar farms · 200 MW · 2.4 mi
- Harry Allen Solar Energy LLCSolar farms · 100 MW · 2.8 mi
- SilverhawkGas power plants · 1,120 MW · 2.9 mi
- Apex Generating StationGas power plants · 601 MW · 3.0 mi
- Mountain View SolarSolar farms · 20.0 MW · 3.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem