SOLAR FARMSEnbridge Solar (Sequoia II)
Enbridge Solar (Sequoia II) is a 415 MW under construction solar farm in Callahan County, Texas, operated by Enbridge Solar (Sequoia II), LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SEQII | Solar Photovoltaic | 415 MW | Under construction (over 50%) |
Plant details
- Operator
- Enbridge Solar (Sequoia II), LLC
- Location
- Callahan County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 415 MW
- EIA plant ID
- 69272
Location
32.3411, -99.1731
Nearby power plants
- Ranchland Wind Project IWind farms · 115 MW · 2.3 mi
- Ranchland Wind Project IIWind farms · 148 MW · 2.3 mi
- Ranchland Wind StorageBattery storage · 73.0 MW · 2.3 mi
- Century Oak Wind Project, LLCWind farms · 152 MW · 6.1 mi
- Longhorn StorageBattery storage · 165 MW · 6.1 mi
- Roadrunner Crossing Energy StorageBattery storage · 150 MW · 6.3 mi
- Sequoia 1Solar farms · 401 MW · 6.8 mi
- Roadrunner Wind FarmWind farms · 256 MW · 7.6 mi
- BMP Wind (TX)Wind farms · 340 MW · 7.8 mi
- CISCO BESSBattery storage · 9.9 MW · 11.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem