United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSSequoia 1
Sequoia 1 is a 401 MW operating solar farm in Eastland County, Texas, operated by Sequoia 1 Solar Project.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SEQ1 | Solar Photovoltaic | 401 MW |
Plant details
- Operator
- Sequoia 1 Solar Project
- Location
- Eastland County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 401 MW
- First unit online
- Dec 2025
- EIA plant ID
- 68200
Location
32.4382, -99.1577
Nearby power plants
- Century Oak Wind Project, LLCWind farms Β· 152 MW Β· 0.7 mi
- Longhorn StorageBattery storage Β· 165 MW Β· 0.7 mi
- Roadrunner Wind FarmWind farms Β· 256 MW Β· 2.8 mi
- Roadrunner Crossing Energy StorageBattery storage Β· 150 MW Β· 3.4 mi
- Enbridge Solar (Sequoia II)Solar farms Β· 415 MW Β· 6.8 mi
- Ranchland Wind Project IIWind farms Β· 148 MW Β· 9.0 mi
- Ranchland Wind StorageBattery storage Β· 73.0 MW Β· 9.0 mi
- Ranchland Wind Project IWind farms Β· 115 MW Β· 9.0 mi
- CISCO BESSBattery storage Β· 9.9 MW Β· 11.0 mi
- BMP Wind (TX)Wind farms Β· 340 MW Β· 12.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem