United States › Power plants › Battery storage › Texas
BATTERY STORAGEBESS TX Camarine - BSHOU001
BESS TX Camarine - BSHOU001 is a 9.9 MW under construction battery storage site in Harris County, Texas, operated by Prologis Logistics Services Incorporated BESS.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Jan 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jan 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BSOU1 | Batteries | 9.9 MW | Under construction (up to 50%) |
Plant details
- Operator
- Prologis Logistics Services Incorporated BESS
- Location
- Harris County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 9.9 MW
- EIA plant ID
- 69246
Location
29.8665, -95.4307
Nearby power plants
- Regis Hidden ValleyBattery storage · 9.9 MW · 3.0 mi
- WAL4526Gas power plants · 1.2 MW · 4.1 mi
- WAL2257Gas power plants · 1.2 MW · 4.8 mi
- BESS TX Panda - BSHOU004Battery storage · 10.0 MW · 5.1 mi
- HEBHoustonDistributionCenterGas power plants · 12.8 MW · 6.6 mi
- Regis Gears HarrisBattery storage · 9.9 MW · 6.7 mi
- BESS TX Top Gear - BSHOU002Battery storage · 10.0 MW · 6.7 mi
- HEBSnackPlantGas power plants · 1.6 MW · 6.8 mi
- Crockett BESSBattery storage · 10.0 MW · 6.9 mi
- ClaraOil-fired power plants · 9.0 MW · 7.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem