United States › Power plants › Battery storage › Texas
BATTERY STORAGESummerhill BESS
Summerhill BESS is a 143 MW planned battery storage site in Taylor County, Texas, operated by RIC Development, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RIC87 | Batteries | 143 MW | Planned, approvals not yet sought |
Plant details
- Operator
- RIC Development, LLC
- Location
- Taylor County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 143 MW
- EIA plant ID
- 68665
Location
32.5129, -99.7956
Nearby power plants
- DGS Five PointsBattery storage · 9.9 MW · 3.5 mi
- Plaza StreetBattery storage · 9.9 MW · 3.8 mi
- HEB00070Gas power plants · 1.2 MW · 5.9 mi
- WAL536Gas power plants · 1.2 MW · 6.1 mi
- Post Oak Wind LLCWind farms · 200 MW · 8.1 mi
- Chimney Rock BESSBattery storage · 156 MW · 9.2 mi
- Funston SolarSolar farms · 350 MW · 19.2 mi
- Mesquite Wind Power LLCWind farms · 200 MW · 19.3 mi
- Callahan Divide Wind Energy CenterWind farms · 114 MW · 19.6 mi
- Tiger SolarSolar farms · 250 MW · 20.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem