United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSTiger Solar
Tiger Solar is a 250 MW under construction solar farm in Jones County, Texas, operated by Vaca Del Sol, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 4666 | Solar Photovoltaic | 250 MW | Under construction (over 50%) |
Plant details
- Operator
- Vaca Del Sol, LLC
- Location
- Jones County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 250 MW
- EIA plant ID
- 67357
Location
32.7969, -99.8809
Nearby power plants
- Anson 2 SolarSolar farms Β· 219 MW Β· 2.3 mi
- ANSON Solar Center, LLCSolar farms Β· 200 MW Β· 2.3 mi
- Jones City 2 SolarSolar farms, Battery storage Β· 385 MW Β· 6.5 mi
- Jones City 1 SolarSolar farms Β· 215 MW Β· 7.4 mi
- Funston SolarSolar farms Β· 350 MW Β· 9.4 mi
- Swenson SolarSolar farms Β· 600 MW Β· 15.6 mi
- Summerhill BESSBattery storage Β· 143 MW Β· 20.2 mi
- Azure Sky SolarSolar farms, Battery storage Β· 316 MW Β· 21.9 mi
- DGS Five PointsBattery storage Β· 9.9 MW Β· 23.3 mi
- Post Oak Wind LLCWind farms Β· 200 MW Β· 23.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem