United States βΊ Power plants βΊ Battery storage βΊ Nevada
BATTERY STORAGE Β· SOLAR FARMSPurple Sage Energy Center
Purple Sage Energy Center is a 800 MW planned power plant in Clark County, Nevada, operated by Noble Solar LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PSGBS | Batteries | 400 MW | Planned, approvals not yet sought |
| PSGPV | Solar Photovoltaic | 400 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Noble Solar LLC
- Location
- Clark County, Nevada
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 800 MW
- EIA plant ID
- 68209
Location
36.0291, -115.8062
Nearby power plants
- Yellow Pine SolarSolar farms, Battery storage Β· 190 MW Β· 3.1 mi
- Yellow Pine IISolar farms, Battery storage Β· 210 MW Β· 3.3 mi
- Rough HatSolar farms Β· 400 MW Β· 5.1 mi
- MDU / NVSS-IISolar farms Β· 13.5 MW Β· 19.3 mi
- Goodsprings Waste Heat RecoveryOther power plants Β· 7.5 MW Β· 26.8 mi
- IKEA Las Vegas 462Solar farms Β· 1.0 MW Β· 29.5 mi
- Dignity - San MartinSolar farms Β· 1.7 MW Β· 29.9 mi
- Silver State Solar Power NorthSolar farms Β· 52.0 MW Β· 30.3 mi
- Solar Las Vegas MB-1Solar farms Β· 4.9 MW Β· 35.3 mi
- CityCenter Central Plant Cogen UnitsGas power plants Β· 8.6 MW Β· 35.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem