United States βΊ Power plants βΊ Solar farms βΊ Nevada
SOLAR FARMSRough Hat
Rough Hat is a 400 MW planned solar farm in Clark County, Nevada, operated by Candela Renewables, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RH1 | Solar Photovoltaic | 400 MW | Regulatory approvals pending |
Plant details
- Operator
- Candela Renewables, LLC
- Location
- Clark County, Nevada
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 400 MW
- EIA plant ID
- 63782
Location
36.0991, -115.8337
Nearby power plants
- Yellow Pine IISolar farms, Battery storage Β· 210 MW Β· 2.9 mi
- Yellow Pine SolarSolar farms, Battery storage Β· 190 MW Β· 4.0 mi
- Purple Sage Energy CenterSolar farms, Battery storage Β· 800 MW Β· 5.1 mi
- MDU / NVSS-IISolar farms Β· 13.5 MW Β· 14.4 mi
- IKEA Las Vegas 462Solar farms Β· 1.0 MW Β· 30.9 mi
- Goodsprings Waste Heat RecoveryOther power plants Β· 7.5 MW Β· 31.0 mi
- Dignity - San MartinSolar farms Β· 1.7 MW Β· 31.5 mi
- Bonanza Solar and Storage ProjectSolar farms, Battery storage Β· 495 MW Β· 31.8 mi
- Silver State Solar Power NorthSolar farms Β· 52.0 MW Β· 34.3 mi
- CityCenter Central Plant Cogen UnitsGas power plants Β· 8.6 MW Β· 36.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem