πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί California

SOLAR FARMS

TWC

TWC is a 1.2 MW operating solar farm in Tulare County, California, operated by Bravo REC Management LLC.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2024 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
TWCSolar Photovoltaic1.2 MW OperatingAug 2024

Plant details

Operator
Bravo REC Management LLC
Location
Tulare County, California
Balancing authority
CISO
Sector
Industrial Non-CHP
Capacity
Operating: 1.2 MW
First unit online
Aug 2024
EIA plant ID
67863

Location

36.1228, -119.4477

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem