πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί California

SOLAR FARMS

Tulare 1 and 2

Tulare 1 and 2 is a 3.0 MW operating solar farm in Tulare County, California, operated by Arevon Energy, Inc..

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2014 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Solar Photovoltaic1.5 MW OperatingJan 2014
2Solar Photovoltaic1.5 MW OperatingJan 2014

Plant details

Operator
Arevon Energy, Inc.
Location
Tulare County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Operating: 3.0 MW
First unit online
Jan 2014
EIA plant ID
58642

Location

36.2000, -119.4200

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem