United States › Power plants › Solar farms › California
SOLAR FARMSCity of Atwater NEM
City of Atwater NEM is a 1.5 MW operating solar farm in Merced County, California, operated by SoCore Energy LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 1.5 MW |
Plant details
- Operator
- SoCore Energy LLC
- Location
- Merced County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 1.5 MW
- First unit online
- Dec 2024
- EIA plant ID
- 67794
Location
37.2740, -120.6290
Nearby power plants
- Merced PipelineSolar farms · 4.1 MW · 7.5 mi
- West Tambo Clean Power IISolar farms · 2.0 MW · 7.8 mi
- Merced Solar LLCSolar farms · 1.5 MW · 8.0 mi
- Mission Solar LLCSolar farms · 1.5 MW · 8.1 mi
- 2097 Helton Solar ProjectSolar farms · 1.5 MW · 8.6 mi
- UC Merced Solar HybridSolar farms, Battery storage · 5.0 MW · 12.5 mi
- Broadway 3 - UC Merced 1Solar farms · 1.0 MW · 12.5 mi
- Dos Palos Cooperative GinSolar farms · 1.0 MW · 13.1 mi
- East Cleveland Road SolarSolar farms · 3.0 MW · 14.0 mi
- Sun Harvest Solar NDP1Solar farms · 1.5 MW · 15.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem