United States › Power plants › Solar farms › California
SOLAR FARMSBroadway 3 - UC Merced 1
Broadway 3 - UC Merced 1 is a 1.0 MW operating solar farm in Merced County, California, operated by MN8 Energy LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Solar Photovoltaic | 1.0 MW |
Plant details
- Operator
- MN8 Energy LLC
- Location
- Merced County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 1.0 MW
- First unit online
- Oct 2009
- EIA plant ID
- 65186
Location
37.3645, -120.4311
Nearby power plants
- UC Merced Solar HybridSolar farms, Battery storage · 5.0 MW · 0.1 mi
- 2097 Helton Solar ProjectSolar farms · 1.5 MW · 4.2 mi
- Mission Solar LLCSolar farms · 1.5 MW · 7.3 mi
- Merced Solar LLCSolar farms · 1.5 MW · 7.3 mi
- ParkerHydroelectric plants · 2.7 MW · 7.9 mi
- Merced PipelineSolar farms · 4.1 MW · 11.0 mi
- Merced FallsHydroelectric plants · 3.4 MW · 12.3 mi
- City of Atwater NEMSolar farms · 1.5 MW · 12.5 mi
- McSwainHydroelectric plants · 9.0 MW · 12.8 mi
- West Tambo Clean Power IISolar farms · 2.0 MW · 15.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem