United States βΊ Power plants βΊ Gas power plants βΊ Florida
GAS POWER PLANTS Β· OIL-FIRED POWER PLANTSHansel
Hansel is a 73.0 MW retired power plant in Osceola County, Florida, operated by Kissimmee Utility Authority.
Plant statusClosed
- Planning (completed)
- Consented (completed)
- Construction (completed)
- OperatingFeb 1959 (completed)
- ClosedOct 2012 (current stage)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 21 | Natural Gas Fired Combined Cycle | 35 MW | Retired |
| 22 | Natural Gas Fired Combined Cycle | 10 MW | Retired |
| 23 | Natural Gas Fired Combined Cycle | 10 MW | Retired |
| 8 | Natural Gas Internal Combustion Engine | 3.0 MW | Retired |
| 19 | Petroleum Liquids | 2.5 MW | Retired |
| 20 | Petroleum Liquids | 2.5 MW | Retired |
| 14 | Natural Gas Internal Combustion Engine | 2.0 MW | Retired |
| 15 | Natural Gas Internal Combustion Engine | 2.0 MW | Retired |
| 16 | Natural Gas Internal Combustion Engine | 2.0 MW | Retired |
| 17 | Natural Gas Internal Combustion Engine | 2.0 MW | Retired |
| 18 | Natural Gas Internal Combustion Engine | 2.0 MW | Retired |
Plant details
- Operator
- Kissimmee Utility Authority
- Location
- Osceola County, Florida
- Balancing authority
- FMPP
- Sector
- Electric Utility
- Capacity
- Retired: 73.0 MW
- First unit online
- Feb 1959
- EIA plant ID
- 672
Location
28.2894, -81.4079
Nearby power plants
- Cane IslandGas power plants Β· 706 MW Β· 7.7 mi
- Intercession CityGas power plants, Oil-fired power plants Β· 1,197 MW Β· 8.8 mi
- Orlando Cogen LPGas power plants Β· 122 MW Β· 10.6 mi
- Walt Disney World Solar FacilitySolar farms Β· 4.9 MW Β· 11.1 mi
- Citrus Ridge SolarSolar farms Β· 52.0 MW Β· 14.8 mi
- Lonesome Camp Solar PlantSolar farms Β· 74.9 MW Β· 17.8 mi
- Osceola Solar FacilitySolar farms Β· 3.8 MW Β· 18.9 mi
- ACE-Stanton PVSolar farms Β· 4.8 MW Β· 19.0 mi
- Turnpike Solar PlantSolar farms Β· 74.9 MW Β· 19.3 mi
- RP-Orlando, LLCSolar farms Β· 5.1 MW Β· 19.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem