United States › Power plants › Gas power plants › Florida

GAS POWER PLANTS · OIL-FIRED POWER PLANTS

Intercession City

Intercession City is a 1,197 MW operating power plant in Osceola County, Florida, operated by Duke Energy Florida, LLC.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 1974 (current stage)
  5. Closed (not yet reached)

Planned retirement: Jun 2034.

Open in Google MapsMore gas power plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
P11Petroleum Liquids149 MW OperatingJan 1997
P7Natural Gas Fired Combustion Turbine104 MW OperatingOct 1993
P8Natural Gas Fired Combustion Turbine104 MW OperatingOct 1993
P9Natural Gas Fired Combustion Turbine104 MW OperatingOct 1993
P10Natural Gas Fired Combustion Turbine104 MW OperatingOct 1993
P12Natural Gas Fired Combustion Turbine98 MW OperatingDec 2000
P13Natural Gas Fired Combustion Turbine98 MW OperatingDec 2000
P14Natural Gas Fired Combustion Turbine98 MW OperatingDec 2000
P1Petroleum Liquids57 MW OperatingMay 1974
P2Petroleum Liquids57 MW OperatingMay 1974
P3Petroleum Liquids57 MW OperatingMay 1974
P4Petroleum Liquids57 MW OperatingMay 1974Planned Jun 2034
P5Petroleum Liquids57 MW OperatingMay 1974Planned Jun 2034
P6Petroleum Liquids57 MW OperatingMay 1974Planned Jun 2034

Plant details

Operator
Duke Energy Florida, LLC
Location
Osceola County, Florida
Balancing authority
FPC
Sector
Electric Utility
Capacity
Operating: 1,197 MW
First unit online
May 1974
EIA plant ID
8049

Location

28.2628, -81.5486

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem