United States βΊ Power plants βΊ Solar farms βΊ Georgia
SOLAR FARMSTroup RC50 II
Troup RC50 II is a 1.5 MW operating solar farm in Troup County, Georgia, operated by Safari Energy, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| TRC50 | Solar Photovoltaic | 1.5 MW |
Plant details
- Operator
- Safari Energy, LLC
- Location
- Troup County, Georgia
- Balancing authority
- SOCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 1.5 MW
- First unit online
- Apr 2020
- EIA plant ID
- 64284
Location
32.8988, -84.8962
Nearby power plants
- Troup RC50Solar farms Β· 2.3 MW Β· 2.7 mi
- Kimberly-Clark SolarSolar farms Β· 2.3 MW Β· 10.6 mi
- Harris ShilohSolar farms Β· 2.1 MW Β· 13.5 mi
- GreenvilleSolar farms Β· 1.0 MW Β· 14.6 mi
- Meriwether JacksonSolar farms Β· 3.0 MW Β· 14.7 mi
- Mossy Branch Battery FacilityBattery storage Β· 65.0 MW Β· 15.2 mi
- West Point (GA)Hydroelectric plants Β· 73.3 MW Β· 17.0 mi
- Bartletts FerryHydroelectric plants Β· 173 MW Β· 19.8 mi
- Camp Solar PlantSolar farms Β· 2.4 MW Β· 20.9 mi
- Goat RockHydroelectric plants Β· 38.6 MW Β· 22.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem