United States βΊ Power plants βΊ Solar farms βΊ Georgia
SOLAR FARMSTroup RC50
Troup RC50 is a 2.3 MW operating solar farm in Harris County, Georgia, operated by Westbound Solar LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| TROUP | Solar Photovoltaic | 2.3 MW |
Plant details
- Operator
- Westbound Solar LLC
- Location
- Harris County, Georgia
- Balancing authority
- SOCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.3 MW
- First unit online
- Apr 2019
- EIA plant ID
- 62885
Location
32.8959, -84.8495
Nearby power plants
- Troup RC50 IISolar farms Β· 1.5 MW Β· 2.7 mi
- Harris ShilohSolar farms Β· 2.1 MW Β· 11.2 mi
- Meriwether JacksonSolar farms Β· 3.0 MW Β· 12.0 mi
- Mossy Branch Battery FacilityBattery storage Β· 65.0 MW Β· 12.7 mi
- Kimberly-Clark SolarSolar farms Β· 2.3 MW Β· 12.9 mi
- GreenvilleSolar farms Β· 1.0 MW Β· 13.0 mi
- Camp Solar PlantSolar farms Β· 2.4 MW Β· 18.3 mi
- West Point (GA)Hydroelectric plants Β· 73.3 MW Β· 19.7 mi
- Bartletts FerryHydroelectric plants Β· 173 MW Β· 21.3 mi
- Talbot County EnergyGas power plants Β· 988 MW Β· 23.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem