United States › Power plants › Hydroelectric plants › Kentucky
HYDROELECTRIC PLANTSMatilda Hamilton Fee Hydroelectric Stati
Matilda Hamilton Fee Hydroelectric Stati is a 2.5 MW operating hydroelectric plant in Estill County, Kentucky, operated by Lock 12 Hydro Partners, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Conventional Hydroelectric | 0.5 MW | |
| 2 | Conventional Hydroelectric | 0.5 MW | |
| 3 | Conventional Hydroelectric | 0.5 MW | |
| 4 | Conventional Hydroelectric | 0.5 MW | |
| 5 | Conventional Hydroelectric | 0.5 MW |
Plant details
- Operator
- Lock 12 Hydro Partners, LLC
- Location
- Estill County, Kentucky
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.5 MW
- First unit online
- Sep 2021
- EIA plant ID
- 62747
Location
37.6775, -83.9486
Nearby power plants
- Blue Ridge GeneratingBioenergy plants · 1.6 MW · 4.9 mi
- Evelyn Hydroelectric ProjectHydroelectric plants · 2.8 MW · 8.2 mi
- KY No. 11 L&D Hydroelectric ProjectHydroelectric plants · 2.8 MW · 11.2 mi
- Heidelberg Hydroelectric ProjectHydroelectric plants · 2.8 MW · 13.0 mi
- J K SmithGas power plants · 938 MW · 16.5 mi
- AEUG Madison Solar, LLCSolar farms · 100 MW · 21.7 mi
- Cooperative Solar OneSolar farms · 8.5 MW · 29.4 mi
- Cooperative Solar Two-FayetteSolar farms · 40.0 MW · 31.8 mi
- SR Turkey Creek, LLCSolar farms · 50.0 MW · 34.4 mi
- Paris (KY)Oil-fired power plants · 10.6 MW · 39.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem