United States › Power plants › Solar farms › Kentucky
SOLAR FARMSCooperative Solar Two-Fayette
Cooperative Solar Two-Fayette is a 40.0 MW under construction solar farm in Fayette County, Kentucky, operated by East Kentucky Power Coop, Inc.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV2 | Solar Photovoltaic | 40 MW | Under construction (up to 50%) |
Plant details
- Operator
- East Kentucky Power Coop, Inc
- Location
- Fayette County, Kentucky
- Balancing authority
- PJM
- Sector
- Electric Utility
- Capacity
- Under construction: 40.0 MW
- EIA plant ID
- 69741
Location
38.0354, -84.3158
Nearby power plants
- Cooperative Solar OneSolar farms · 8.5 MW · 3.4 mi
- HaeflingGas power plants · 41.4 MW · 11.5 mi
- Paris (KY)Oil-fired power plants · 10.6 MW · 12.4 mi
- AEUG Madison Solar, LLCSolar farms · 100 MW · 14.8 mi
- J K SmithGas power plants · 938 MW · 15.7 mi
- Bluebird Solar LLCSolar farms · 100 MW · 18.6 mi
- KY No. 11 L&D Hydroelectric ProjectHydroelectric plants · 2.8 MW · 20.9 mi
- Blue MoonSolar farms · 70.0 MW · 23.4 mi
- Green City Recovery, LLCBioenergy plants · 2.0 MW · 24.9 mi
- Mother Ann LeeHydroelectric plants · 2.1 MW · 26.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem