United States › Power plants › Battery storage › Washington
BATTERY STORAGETurner Energy Storage Project
Turner Energy Storage Project is a 1.2 MW retired battery storage site in Whitman County, Washington, operated by Avista Corp.
Plant statusClosed
- Planning (completed)
- Consented (completed)
- Construction (completed)
- OperatingApr 2014 (completed)
- ClosedSep 2018 (current stage)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| TES | Batteries | 1.2 MW 3 MWh |
Retired |
Plant details
- Operator
- Avista Corp
- Location
- Whitman County, Washington
- Balancing authority
- AVA
- Sector
- Electric Utility
- Capacity
- Retired: 1.2 MW
- First unit online
- Apr 2014
- EIA plant ID
- 60675
Location
46.7518, -117.1614
Nearby power plants
- Biotech LS 0836Oil-fired power plants · 1.0 MW · 1.3 mi
- Grimes WayGas power plants, Oil-fired power plants · 4.0 MW · 1.7 mi
- Lower GraniteHydroelectric plants · 810 MW · 14.2 mi
- Clearwater Paper IPP LewistonBioenergy plants · 93.8 MW · 24.4 mi
- PalouseWind farms · 105 MW · 29.5 mi
- Lower Snake River Wind Energy ProjectWind farms · 343 MW · 35.1 mi
- Lower Snake Solar Generation BESSSolar farms, Battery storage · 600 MW · 35.9 mi
- Marengo Wind PlantWind farms · 234 MW · 39.2 mi
- Hopkins Ridge WindWind farms · 157 MW · 39.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem