United States βΊ Power plants βΊ Wind farms βΊ Washington
WIND FARMSPalouse
Palouse is a 105 MW operating wind farm in Whitman County, Washington, operated by Onward Energy.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 105 MW |
Plant details
- Operator
- Onward Energy
- Location
- Whitman County, Washington
- Balancing authority
- AVA
- Sector
- IPP Non-CHP
- Capacity
- Operating: 105 MW
- First unit online
- Dec 2012
- EIA plant ID
- 57530
Location
47.1558, -117.3644
Nearby power plants
- Biotech LS 0836Oil-fired power plants Β· 1.0 MW Β· 30.8 mi
- Grimes WayGas power plants, Oil-fired power plants Β· 4.0 MW Β· 31.2 mi
- Fighting Creek LFGTE PlantBioenergy plants Β· 3.2 MW Β· 33.0 mi
- Spokane Waste to EnergyBioenergy plants Β· 26.0 MW Β· 33.2 mi
- Lower GraniteHydroelectric plants Β· 810 MW Β· 34.4 mi
- Monroe StreetHydroelectric plants Β· 14.8 MW Β· 34.5 mi
- Upper FallsHydroelectric plants Β· 10.0 MW Β· 34.5 mi
- Upriver Dam Hydro PlantHydroelectric plants Β· 17.6 MW Β· 36.4 mi
- Boulder ParkGas power plants Β· 24.6 MW Β· 38.8 mi
- Northeast (WA)Gas power plants Β· 61.8 MW Β· 40.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem