United States › Power plants › Solar farms › California
SOLAR FARMSHidden Hills Solar Plant 1
Hidden Hills Solar Plant 1 is a 250 MW cancelled solar farm in Inyo County, California, operated by Hidden Hills Solar I LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Solar Thermal without Energy Storage | 250 MW | Cancelled or postponed |
Plant details
- Operator
- Hidden Hills Solar I LLC
- Location
- Inyo County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 250 MW
- EIA plant ID
- 57905
Location
35.7883, -115.6847
Nearby power plants
- Goodsprings Waste Heat RecoveryOther power plants · 7.5 MW · 15.4 mi
- Purple Sage Energy CenterSolar farms, Battery storage · 800 MW · 18.0 mi
- Ivanpah 3Solar farms · 133 MW · 18.3 mi
- Silver State Solar Power NorthSolar farms · 52.0 MW · 18.7 mi
- Yellow Pine SolarSolar farms, Battery storage · 190 MW · 19.9 mi
- Ivanpah 2Solar farms · 133 MW · 20.1 mi
- Stateline SolarSolar farms · 300 MW · 20.6 mi
- Yellow Pine IISolar farms, Battery storage · 210 MW · 20.7 mi
- Silver State South StorageBattery storage · 200 MW · 21.9 mi
- Ivanpah 1Solar farms · 126 MW · 21.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem