United States › Power plants › Solar farms › California
SOLAR FARMSSolar Photovoltaic Project #25
Solar Photovoltaic Project #25 is a 4.5 MW cancelled solar farm in San Bernardino County, California, operated by Southern California Edison Co.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| S25A | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25B | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25C | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25D | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25E | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25F | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25G | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25H | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S25I | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
Plant details
- Operator
- Southern California Edison Co
- Location
- San Bernardino County, California
- Balancing authority
- CISO
- Sector
- Electric Utility
- Capacity
- Cancelled: 4.5 MW
- EIA plant ID
- 57528
Location
34.1306, -117.4219
Nearby power plants
- Niagara Bottling - RialtoSolar farms · 4.2 MW · 0.4 mi
- Inland Empire Energy StorageBattery storage · 70.0 MW · 0.6 mi
- Chambers 4 - Rialto LGB8Solar farms · 2.2 MW · 0.9 mi
- FontanaHydroelectric plants · 3.0 MW · 2.2 mi
- IOS II-LAX9Solar farms · 4.0 MW · 3.2 mi
- Rialto - High SchoolSolar farms · 0.9 MW · 4.7 mi
- OES Biogas PowerBioenergy plants · 2.6 MW · 5.2 mi
- CA Bloomington 2551 S Lilac Avenue MicroSolar farms, Battery storage · 3.0 MW · 5.8 mi
- Mountain View Ind Park 1-sline001Solar farms · 1.1 MW · 6.0 mi
- Drews Generating FacilityGas power plants · 44.8 MW · 6.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem