πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Geothermal plants β€Ί Nevada

GEOTHERMAL PLANTS

San Emidio

San Emidio is a 11.8 MW operating geothermal plant in Washoe County, Nevada, operated by USG Nevada LLC.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2012 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore geothermal plants in Nevada

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
SE-U1Geothermal12 MW OperatingMay 2012

Plant details

Operator
USG Nevada LLC
Location
Washoe County, Nevada
Balancing authority
NEVP
Sector
IPP Non-CHP
Capacity
Operating: 11.8 MW
First unit online
May 2012
EIA plant ID
57456

Location

40.3806, -119.3997

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem