United States › Power plants › Battery storage › Nevada
BATTERY STORAGE · SOLAR FARMSSierra Solar Hybrid
Sierra Solar Hybrid is a 800 MW operating power plant in Churchill County, Nevada, operated by Sierra Pacific Power Co. Its batteries store up to 1,600 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SSES1 | Batteries | 400 MW 1,600 MWh |
|
| SSPV1 | Solar Photovoltaic | 400 MW | Built, awaiting commercial operation |
Plant details
- Operator
- Sierra Pacific Power Co
- Location
- Churchill County, Nevada
- Balancing authority
- NEVP
- Sector
- Electric Utility
- Capacity
- Operating: 400 MW
Under construction: 400 MW - First unit online
- Mar 2026
- EIA plant ID
- 67978
Location
39.8536, -119.0394
Nearby power plants
- BradyGeothermal plants, Solar farms · 29.5 MW · 4.3 mi
- Desert Peak Power PlantGeothermal plants · 26.0 MW · 8.3 mi
- Patua Acquisition Project, LLCGeothermal plants, Solar farms · 58.6 MW · 18.6 mi
- Soda Lake 3Geothermal plants · 26.0 MW · 23.0 mi
- New LahontanHydroelectric plants · 4.0 MW · 27.0 mi
- LahontanHydroelectric plants · 1.8 MW · 27.1 mi
- Chukar Battery Energy Storage SystemBattery storage · 10.0 MW · 29.5 mi
- Tesla Reno GigaFactorySolar farms · 7.7 MW · 30.4 mi
- Turquoise Liberty SolarSolar farms · 10.0 MW · 31.4 mi
- Turquoise Nevada, LLCSolar farms · 60.0 MW · 32.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem