🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › Washington

BIOENERGY PLANTS

Longview Fibre

Longview Fibre is a 45.0 MW operating bioenergy plant in Cowlitz County, Washington, operated by Longview Fibre Co.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 1936 (current stage)
  5. ClosedJun 2018 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore bioenergy plants in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
7Wood/Wood Waste Biomass25 MW OperatingApr 1966
6Wood/Wood Waste Biomass20 MW OperatingJan 1958
8Natural Gas Fired Combustion Turbine68 MW RetiredMay 1995Oct 2002
4Wood/Wood Waste Biomass10 MW RetiredJan 1949Jun 2018
5Wood/Wood Waste Biomass6.0 MW RetiredJan 1950Apr 2007
3Wood/Wood Waste Biomass3.5 MW RetiredJan 1941Apr 2007
2Wood/Wood Waste Biomass2.5 MW RetiredJan 1936Apr 2007

Plant details

Operator
Longview Fibre Co
Location
Cowlitz County, Washington
Balancing authority
BPAT
Sector
Industrial CHP
Capacity
Operating: 45.0 MW
Retired: 90.0 MW
First unit online
Jan 1936
EIA plant ID
54562

Location

46.1039, -122.9184

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem