🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › Washington

BIOENERGY PLANTS

Nippon Dynawave Packaging Longview WA

Nippon Dynawave Packaging Longview WA is a 62.4 MW operating bioenergy plant in Cowlitz County, Washington, operated by Nippon Dynawave Packaging Co..

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 1948 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore bioenergy plants in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
TG5Wood/Wood Waste Biomass31 MW OperatingJan 1976
TG4Wood/Wood Waste Biomass18 MW OperatingJan 1954
TG1Wood/Wood Waste Biomass8.0 MW OperatingJan 1948
TG2Wood/Wood Waste Biomass5.0 MW OperatingJan 1948

Plant details

Operator
Nippon Dynawave Packaging Co.
Location
Cowlitz County, Washington
Balancing authority
BPAT
Sector
Industrial CHP
Capacity
Operating: 62.4 MW
First unit online
Jan 1948
EIA plant ID
50187

Location

46.1236, -122.9728

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem