United States › Power plants › Geothermal plants › Nevada
GEOTHERMAL PLANTSSoda Lake Geothermal No I II
Soda Lake Geothermal No I II is a 26.1 MW retired geothermal plant in Churchill County, Nevada, operated by Cyrq Energy Corp.
Plant statusClosed
- Planning (completed)
- Consented (completed)
- Construction (completed)
- OperatingDec 1987 (completed)
- ClosedJan 2022 (current stage)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| OEC1 | Geothermal | 3.5 MW | Retired |
| OEC2 | Geothermal | 3.5 MW | Retired |
| OEC3 | Geothermal | 3.5 MW | Retired |
| OEC4 | Geothermal | 3.5 MW | Retired |
| OEC5 | Geothermal | 3.5 MW | Retired |
| OEC6 | Geothermal | 3.5 MW | Retired |
| OE21 | Geothermal | 1.5 MW | Retired |
| OE11 | Geothermal | 1.2 MW | Retired |
| OE12 | Geothermal | 1.2 MW | Retired |
| OE13 | Geothermal | 1.2 MW | Retired |
Plant details
- Operator
- Cyrq Energy Corp
- Location
- Churchill County, Nevada
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
- Capacity
- Retired: 26.1 MW
- First unit online
- Dec 1987
- EIA plant ID
- 52174
Location
39.5570, -118.8383
Nearby power plants
- Soda Lake 3Geothermal plants · 26.0 MW · 0.6 mi
- Patua Acquisition Project, LLCGeothermal plants, Solar farms · 58.6 MW · 12.7 mi
- New LahontanHydroelectric plants · 4.0 MW · 13.7 mi
- LahontanHydroelectric plants · 1.8 MW · 13.8 mi
- Stillwater Solar PV IISolar farms · 20.0 MW · 14.9 mi
- Desert Peak Power PlantGeothermal plants · 26.0 MW · 14.9 mi
- Stillwater FacilityGeothermal plants, Solar farms · 69.2 MW · 15.1 mi
- BradyGeothermal plants, Solar farms · 29.5 MW · 18.9 mi
- Salt WellsGeothermal plants · 23.6 MW · 23.0 mi
- Sierra Solar HybridSolar farms, Battery storage · 800 MW · 23.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem