United States βΊ Power plants βΊ Oil-fired power plants
OCTARY USA Β· OIL-FIRED POWER PLANTSPetroleum coke plants in the USA
Petroleum-fired generators in the United States, mostly back-up, peaking and island supply. Click a state to drill down, or search near a place.
Operating10plants
Operating capacity1,468 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
10 plants
| Plant | Capacity | Stage |
|---|---|---|
| Brame Energy Center | 704 MW | |
| R S Nelson | 227 MW | |
| FirstEnergy Bay Shore | 171 MW | |
| Savannah River Mill | 90.0 MW | |
| Yellowstone Energy LP | 68.0 MW | |
| Manitowoc | 63.4 MW | |
| Valero Refinery Corpus Christi West | 57.2 MW | |
| Alpena Cement Plant | 47.2 MW | |
| Roquette America | 34.4 MW | |
| Toledo Ref Power Recovery Train | 6.0 MW |
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Cleco Power LLC1 plants Β· 704 MW
- Entergy Louisiana LLC1 plants Β· 227 MW
- Walleye Power, LLC1 plants Β· 171 MW
- Georgia-Pacific Consr Prods LP-Savannah1 plants Β· 90.0 MW
- Yellowstone Energy LP1 plants Β· 68.0 MW
- Manitowoc Public Utilities1 plants Β· 63.4 MW
- Valero Refining Co1 plants Β· 57.2 MW
- Amrize Cement Inc.1 plants Β· 47.2 MW
- Roquette America1 plants Β· 34.4 MW
- Toledo Refining Company1 plants Β· 6.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map