United States βΊ Power plants βΊ Oil-fired power plants
OCTARY USA Β· OIL-FIRED POWER PLANTSUnder-construction oil-fired power plants in the USA
Petroleum-fired generators in the United States, mostly back-up, peaking and island supply. Click a state to drill down, or search near a place.
Operating1,039plants
Operating capacity31.0 GWnameplate
Under construction43.8 MW8 plants
Whole pipeline174 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
8 plants
| Plant | Capacity | Stage |
|---|---|---|
| Franklin Heating Station | 17.0 MW | Under construction |
| Iola | 8.0 MW | Under construction |
| Chanute 1 | 6.6 MW | Under construction |
| Tecumseh | 4.2 MW | Under construction |
| Belleville | 3.0 MW | Under construction |
| Bushnell | 2.5 MW | Under construction |
| Wisner | 1.5 MW | Under construction |
| Lincoln Medical and Mental Health Center | 1.0 MW | Under construction |
Operating capacity by state
Click a state to drill down.
AK826MWME883MWVT154MWNH521MWWA18MWID5MWMT68MWND67MWMN701MWIL716MWWI732MWMI476MWNY3.6GWRI7MWMA1.9GWOR10MWNVβWY6MWSD289MWIA903MWIN98MWOH719MWPA1.7GWNJ71MWCT2.1GWCA522MWUT29MWCO172MWNE425MWMO1.2GWKY11MWWV19MWVA973MWMD1.7GWDE121MWAZ125MWNM27MWKS731MWAR7MWTN167MWNC578MWSC297MWDCβOK51MWLA985MWMS9MWAL34MWGA1.4GWHI2.1GWTX879MWFL1.9GW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Franklin Heating Station1 plants Β· 17.0 MW
- City of Iola - (KS)1 plants Β· 8.0 MW
- City of Chanute (KS)1 plants Β· 6.6 MW
- City of Tecumseh - (NE)1 plants Β· 4.2 MW
- City of Belleville - (KS)1 plants Β· 3.0 MW
- City of Bushnell - (IL)1 plants Β· 2.5 MW
- City of Wisner (NE)1 plants Β· 1.5 MW
- Lincoln Medical and Mental Health Center1 plants Β· 1.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map