United States βΊ Power plants
OCTARY USA Β· POWER PLANTSImperial Irrigation District: power plants in the USA
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| El Centro Hybrid Gas power plants, Battery storage |
501 MW 20 MWh |
|
| Niland Gas Turbine Plant Gas power plants |
121 MW | |
| Coachella Gas power plants |
92.4 MW | |
| Rockwood Gas power plants, Oil-fired power plants |
49.8 MW | |
| Pilot Knob Hydroelectric plants |
33.0 MW | |
| Imperial Valley Solar Company 1 LLC Solar farms |
23.0 MW | |
| Drop 4 Hydroelectric plants |
19.6 MW | |
| Drop 2 (CA) Hydroelectric plants |
10.0 MW | |
| Drop 3 (CA) Hydroelectric plants |
9.2 MW | |
| Drop 1 Hydroelectric plants |
5.7 MW | |
| Drop 5 (CA) Hydroelectric plants |
4.0 MW | |
| IVC Solar Solar farms |
3.0 MW | |
| East Highline Hydroelectric plants |
2.4 MW |
Operating capacity by state
Click a state to drill down.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants597 MW Β· +113 MW pipeline
- Hydroelectric plants83.9 MW
- Battery storage30.0 MW
- Solar farms26.0 MW
- Oil-fired power plants24.9 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Florida Power & Light Co153 plants Β· 41.8 GW
- Tennessee Valley Authority55 plants Β· 40.4 GW
- Duke Energy Carolinas, LLC55 plants Β· 24.4 GW
- Entergy Louisiana LLC28 plants Β· 23.2 GW
- Georgia Power Co45 plants Β· 23.1 GW
- Constellation Nuclear12 plants Β· 22.8 GW
- Virginia Electric & Power Co36 plants Β· 21.2 GW
- Invenergy Services LLC86 plants Β· 18.4 GW
- Alabama Power Co27 plants Β· 16.2 GW
- RWE Americas, LLC166 plants Β· 15.3 GW
- U S Bureau of Reclamation56 plants Β· 14.7 GW
- Duke Energy Progress - (NC)29 plants Β· 14.3 GW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map