πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants

OCTARY USA Β· POWER PLANTS

Origis Energy USA, Inc: power plants in the USA

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating17plants
Operating capacity2,195 MWnameplate
Under construction89.9 MW1 plants
Whole pipeline342 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

20 plants
PlantCapacityStageStateOwner / operatorYear
Golden Triangle
Solar farms, Battery storage
250 MW
200 MWh
Operating MS
Lowndes
Origis Energy USA, Inc 2025
Optimist
Solar farms, Battery storage
250 MW
200 MWh
Operating MS
Clay
Origis Energy USA, Inc 2026
Rockhound A
Solar farms
245 MW Operating TX
Ector
Origis Energy USA, Inc 2026
Escalante (NM)
Solar farms
200 MW Operating NM
McKinley
Origis Energy USA, Inc 2024
Golden Triangle II
Solar farms, Battery storage
200 MW
200 MWh
Operating MS
Lowndes
Origis Energy USA, Inc 2024
Swift Air Solar II
Solar farms
174 MW Operating TX
Ector
Origis Energy USA, Inc 2025
Sand Luis West
Solar farms, Battery storage
156 MW Consented CA
Fresno
Origis Energy USA, Inc 2028
Wheatland
Solar farms
150 MW Operating IN
Knox
Origis Energy USA, Inc 2026
Swift Air Solar I
Solar farms
145 MW Operating TX
Ector
Origis Energy USA, Inc 2025
Swift Air Solar III
Solar farms
100 MW Operating TX
Ector
Origis Energy USA, Inc 2025
Covington (MS)
Solar farms
96.0 MW Consented MS
Covington
Origis Energy USA, Inc 2028
Chalan
Solar farms, Battery storage
89.9 MW Under construction CA
Kern
Origis Energy USA, Inc 2026
Walker Springs I
Solar farms
80.0 MW Operating AL
Clarke
Origis Energy USA, Inc 2026
Walker Springs II
Solar farms
80.0 MW Operating AL
Clarke
Origis Energy USA, Inc 2026
Wing
Solar farms
80.0 MW Operating AL
Covington
Origis Energy USA, Inc 2023
Whistling Duck I
Solar farms
75.0 MW Operating FL
Levy
Origis Energy USA, Inc 2025
Rice Creek
Solar farms
74.9 MW Operating FL
Putnam
Origis Energy USA, Inc 2024
Rockhound C
Solar farms
61.0 MW Operating TX
Ector
Origis Energy USA, Inc 2026
Rockhound D
Solar farms
28.0 MW Operating TX
Ector
Origis Energy USA, Inc 2026
MA Solar Storage 1 Hybrid
Solar farms, Battery storage
2.1 MW
2 MWh
Operating MA
Worcester
Origis Energy USA, Inc 2018

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map