πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants

OCTARY USA Β· POWER PLANTS

Connecticut Mun Elec Engy Coop: power plants in the USA

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating10plants
Operating capacity59.4 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

10 plants
PlantCapacityStageStateOwner / operatorYear
Backus Microgrid Project
Oil-fired power plants
10.4 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2014
Fort Hill 1, 2, 3 & 4
Oil-fired power plants
10.4 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
Subase Microgrid Project
Gas power plants
7.4 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2022
Bridge Street 1 & 2
Oil-fired power plants
5.2 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
Gary Court 1 & 2
Oil-fired power plants
5.2 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
Lebanon Pines 1 & 2
Oil-fired power plants
5.2 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
LNG 1 & 2
Oil-fired power plants
5.2 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
Water Treatment 1 & 2
Oil-fired power plants
5.2 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010
Fishers Island 1
Oil-fired power plants
2.6 MW Operating NY
Suffolk
Connecticut Mun Elec Engy Coop 2010
Jewett City 1
Oil-fired power plants
2.6 MW Operating CT
New London
Connecticut Mun Elec Engy Coop 2010

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map