United States › Grid › Transmission lines › South Dakota
OCTARY USA · TRANSMISSION220–287 kV transmission lines in South Dakota
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Stegall | 230 kV | 205 km |
| Bismarck – Glenham | 230 kV | 153 km |
| Fort Thompson – Fort Randall | 230 kV | 141 km |
| Fort Randall | 230 kV | 135 km |
| New Underwood – Wayside | 230 kV | 129 km |
| Fort Thompson | 230 kV | 122 km |
| Hughes – Lookout | 230 kV | 121 km |
| New Underwood – Maurine | 230 kV | 116 km |
| Utica Junction | 230 kV | 116 km |
| Sioux Falls | 230 kV | 113 km |
| Oahe | 230 kV | 107 km |
| Vt Hanlon | 230 kV | 98.5 km |
| New Underwood | 230 kV | 97.6 km |
| Fort Thompson – Huron | 230 kV | 95.2 km |
| Fort Thompson – Huron | 230 kV | 95.2 km |
| Fort Thompson – Oahe | 230 kV | 92.4 km |
| Fort Thompson – Oahe | 230 kV | 92.3 km |
| West Hill | 230 kV | 91.7 km |
| Fort Thompson – Oahe | 230 kV | 89.0 km |
| Fort Thompson – Oahe | 230 kV | 89.0 km |
| Watertown | 230 kV | 88.8 km |
| Lookout – Lange | 230 kV | 87.7 km |
| Fort Randall – Utica Junction | 230 kV | 80.1 km |
| Fort Randall – Utica Junction | 230 kV | 80.1 km |
| Watertown | 230 kV | 78.1 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- WAPA-- Western Area Power Administration1,623 km
- Black Hills Power, Inc.710 km
- Northwestern Energy - (sd)388 km
- Otter Tail Power Co281 km
- Montana-dakota Utilities Co175 km
- Montana-dakota Utilities Co.58.5 km
- Midamerican Energy Co43.1 km
- West River Electric Assn Inc24.8 km
- Northern States Power Co - Minnesota1.7 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants