United States βΊ Grid βΊ Transmission lines βΊ New Mexico
OCTARY USA Β· TRANSMISSION345 kV transmission lines in New Mexico
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| West Mesa β Arroyo | 345 kV | 326 km |
| Springerville | 345 kV | 322 km |
| Substation names not reported | 345 kV | 266 km |
| Four Corners | 345 kV | 255 km |
| Eddy Ac-dc-ac Tie | 345 kV | 254 km |
| Four Corners | 345 kV | 254 km |
| West Mesa β Four Corners | 345 kV | 251 km |
| Substation names not reported | 345 kV | 248 km |
| Eddy Ac-dc-ac Tie β Amrad | 345 kV | 202 km |
| Springerville β Greenlee | 345 kV | 178 km |
| Springerville | 345 kV | 173 km |
| Springerville | 345 kV | 173 km |
| Pinto β Four Corners | 345 kV | 163 km |
| Substation names not reported | 345 kV | 146 km |
| Substation names not reported | 345 kV | 146 km |
| Guadalupe | 345 kV | 145 km |
| Luna | 345 kV | 137 km |
| Guadalupe | 345 kV | 113 km |
| Substation names not reported | 345 kV | 100.0 km |
| Greenlee | 345 kV | 96.5 km |
| Luna | 345 kV | 91.9 km |
| Amrad | 345 kV | 91.2 km |
| Luna | 345 kV | 81.1 km |
| Hesperus β Waterflow | 345 kV | 70.8 km |
| Norton | 345 kV | 68.0 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Xcel Energy169 km Β· 169 km at 345 kV+
- Pacificorp163 km Β· 163 km at 345 kV+
- Southwestern Public Service Co100.0 km Β· 100.0 km at 345 kV+
- El Paso Electric Power Company97.2 km Β· 97.2 km at 345 kV+
- Tri-state G & T Assn, Inc70.8 km Β· 70.8 km at 345 kV+
- Public Service Company Of New Mexico0.6 km Β· 0.6 km at 345 kV+
- Roosevelt County Electric Cooperative0.4 km Β· 0.4 km at 345 kV+
- Navajo Tribal Utility Authority0.2 km Β· 0.2 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants