United States › Grid › Transmission lines › New Mexico
OCTARY USA · TRANSMISSION220–287 kV transmission lines in New Mexico
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Walsenburg – Gladstone | 230 kV | 187 km |
| Kayenta | 230 kV | 169 km |
| Substation names not reported | 230 kV | 144 km |
| Ambrosia – West Mesa | 230 kV | 111 km |
| Lost Canyon – Shiprock | 230 kV | 94.8 km |
| Eddy Ac-dc-ac Tie | 230 kV | 94.5 km |
| Eddy Ac-dc-ac Tie | 230 kV | 84.7 km |
| Substation names not reported | 230 kV | 83.1 km |
| Substation names not reported | 230 kV | 75.6 km |
| Substation names not reported | 230 kV | 74.9 km |
| Substation names not reported | 230 kV | 64.1 km |
| Roosevelt County | 230 kV | 64.0 km |
| Potash Junction | 230 kV | 63.6 km |
| Substation names not reported | 230 kV | 63.1 km |
| Bisti | 230 kV | 61.4 km |
| Ambrosia | 230 kV | 49.5 km |
| Eddy Ac-dc-ac Tie | 230 kV | 39.3 km |
| Four Corners | 230 kV | 34.5 km |
| Substation names not reported | 230 kV | 33.2 km |
| Potash Junction | 230 kV | 23.6 km |
| Ambrosia – Pruitt Escalante (pegs) | 230 kV | 23.4 km |
| Bisti | 230 kV | 22.4 km |
| Substation names not reported | 230 kV | 19.1 km |
| Substation names not reported | 230 kV | 11.9 km |
| Gallegos | 230 kV | 8.2 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Tri-state G & T Assn, Inc187 km
- Navajo Tribal Utility Authority130 km
- WAPA-- Western Area Power Administration94.8 km
- Roosevelt County Electric Cooperative80.2 km
- Southwestern Public Service Co75.0 km
- Xcel Energy64.8 km
- Bailey County Elec Coop Assn64.1 km
- Farmer's Electirc Cooperative19.1 km
- Public Service Company Of New Mexico10.0 km
- Central New Mexico Electric Cooperative2.3 km
- Lea County Electric Cooperative0.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants