🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Transmission lines › New Mexico

OCTARY USA · TRANSMISSION

220–287 kV transmission lines in New Mexico

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections40mapped segments
Route length1,741 km1,082 mi
345 kV and above5,151 kmthe backbone
Owners12utilities and others

Map

Loading lines…
HVDC500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Walsenburg – Gladstone230 kV187 km Tri-state G & T Assn, IncCO, NM
Kayenta230 kV169 km Owner not reportedNM, AZ
Substation names not reported230 kV144 km Owner not reportedNM, TX
Ambrosia – West Mesa230 kV111 km Owner not reportedNM
Lost Canyon – Shiprock230 kV94.8 km WAPA-- Western Area Power AdministrationCO, NM
Eddy Ac-dc-ac Tie230 kV94.5 km Owner not reportedNM
Eddy Ac-dc-ac Tie230 kV84.7 km Owner not reportedNM
Substation names not reported230 kV83.1 km Owner not reportedNM
Substation names not reported230 kV75.6 km Owner not reportedNM, TX
Substation names not reported230 kV74.9 km Roosevelt County Electric CooperativeNM
Substation names not reported230 kV64.1 km Bailey County Elec Coop AssnNM, TX
Roosevelt County230 kV64.0 km Xcel EnergyNM
Potash Junction230 kV63.6 km Owner not reportedNM
Substation names not reported230 kV63.1 km Southwestern Public Service CoTX, NM
Bisti230 kV61.4 km Navajo Tribal Utility AuthorityNM
Ambrosia230 kV49.5 km Owner not reportedNM
Eddy Ac-dc-ac Tie230 kV39.3 km Owner not reportedNM
Four Corners230 kV34.5 km Navajo Tribal Utility AuthorityNM
Substation names not reported230 kV33.2 km Owner not reportedNM
Potash Junction230 kV23.6 km Owner not reportedNM
Ambrosia – Pruitt Escalante (pegs)230 kV23.4 km Owner not reportedNM
Bisti230 kV22.4 km Navajo Tribal Utility AuthorityNM
Substation names not reported230 kV19.1 km Farmer's Electirc CooperativeNM
Substation names not reported230 kV11.9 km Southwestern Public Service CoNM
Gallegos230 kV8.2 km Navajo Tribal Utility AuthorityNM

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants