πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Transmission lines β€Ί Arizona

OCTARY USA Β· TRANSMISSION

345 kV transmission lines in Arizona

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections27mapped segments
Route length4,009 km2,491 mi
345 kV and above8,658 kmthe backbone
Owners5utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Springerville345 kV384 km Owner not reportedAZ
Springerville345 kV322 km Owner not reportedNM, AZ
Four Corners345 kV255 km Owner not reportedNM, AZ
Four Corners345 kV254 km Owner not reportedNM, AZ
Peacock – Liberty345 kV243 km Owner not reportedAZ
Substation names not reported345 kV209 km Owner not reportedAZ
Substation names not reported345 kV200 km Owner not reportedAZ
Substation names not reported345 kV200 km Owner not reportedAZ
Pinal West – South345 kV189 km Owner not reportedAZ
Pinnacle Peak Walc345 kV184 km Arizona Public Service CompanyAZ
Pinnacle Peak Walc345 kV184 km Arizona Public Service CompanyAZ
Springerville – Greenlee345 kV178 km Owner not reportedAZ, NM
Springerville345 kV173 km Owner not reportedNM, AZ
Springerville345 kV173 km Owner not reportedNM, AZ
Greenlee345 kV141 km Owner not reportedAZ
Peacock – Mead345 kV141 km Owner not reportedAZ, NV
Preacher Canyon345 kV111 km Owner not reportedAZ
Pinal West345 kV99.2 km Owner not reportedAZ
Preacher Canyon345 kV98.4 km Owner not reportedAZ
Greenlee345 kV96.5 km Owner not reportedNM, AZ
Substation names not reported345 kV65.7 km Owner not reportedAZ
Bicknell345 kV38.2 km Owner not reportedAZ
Coronado – Springerville345 kV35.8 km Navopache Electric CooperativeAZ
South345 kV22.5 km Tucson Electric Power CompanyAZ
Morenci345 kV7.2 km Ducan Valley Electric CooperativeAZ

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants