United States βΊ Grid βΊ Transmission lines βΊ Oklahoma
OCTARY USA Β· TRANSMISSIONOwner not reported: Transmission lines in Oklahoma
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Hugo (345 Kv) β Sunnyside | 345 kV | 198 km |
| Thistle β Woodward | 345 kV | 172 km |
| Thistle β Woodward | 345 kV | 172 km |
| Woodward β Border | 345 kV | 152 km |
| Chouteau | 345 kV | 150 km |
| Kiamichi Station | 345 kV | 134 km |
| Kiamichi Station | 345 kV | 134 km |
| Woodward | 345 kV | 125 km |
| Woodward | 345 kV | 125 km |
| Rose Hill β Charles D. Lamb Energy Center | 345 kV | 100 km |
| Johnston County (og&e) Substation β Pittsburg | 345 kV | 92.5 km |
| Neosho β Delaware | 345 kV | 77.4 km |
| Sunnyside β Teryy Road Substation | 345 kV | 69.6 km |
| Sooner β Cleveland | 345 kV | 58.1 km |
| Riverside β Pecan Creek | 345 kV | 58.0 km |
| Muskogee β Pecan Creek | 345 kV | 38.1 km |
| Tatonga | 345 kV | 37.0 km |
| Muskogee β Clarksville | 345 kV | 34.3 km |
| Beaver County | 345 kV | 34.3 km |
| Beaver County | 345 kV | 34.2 km |
| Cimarron β Minco | 345 kV | 34.2 km |
| Muskogee β Pecan Creek | 345 kV | 25.7 km |
| Muskogee | 345 kV | 22.6 km |
| Muskogee | 345 kV | 19.9 km |
| Tatonga | 345 kV | 16.5 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Public Service Co Of Oklahoma10,253 km Β· 1,272 km at 345 kV+
- Oklahoma Gas & Electric Co9,334 km Β· 1,879 km at 345 kV+
- Tri-county Electric Coop, Inc1,160 km Β· 103 km at 345 kV+
- Southwestern Power Administration633 km
- Empire District Electric Co110 km Β· 110 km at 345 kV+
- Northeast Oklahoma Electric Co53.8 km
- Kansas Gas & Electric Co32.9 km
- Southwestern Electric Power Co29.2 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants