πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Transmission lines β€Ί New Mexico

OCTARY USA Β· TRANSMISSION

Owner not reported: Transmission lines in New Mexico

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections176mapped segments
Route length8,508 km5,287 mi
345 kV and above4,260 kmthe backbone
Owners1utilities and others

Map

Loading lines…
345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
West Mesa – Arroyo345 kV326 km Owner not reportedNM
Springerville345 kV322 km Owner not reportedNM, AZ
Substation names not reported345 kV266 km Owner not reportedNM
Four Corners345 kV255 km Owner not reportedNM, AZ
Eddy Ac-dc-ac Tie345 kV254 km Owner not reportedTX, NM
Four Corners345 kV254 km Owner not reportedNM, AZ
West Mesa – Four Corners345 kV251 km Owner not reportedNM
Substation names not reported345 kV248 km Owner not reportedNM
Eddy Ac-dc-ac Tie – Amrad345 kV202 km Owner not reportedNM
Springerville – Greenlee345 kV178 km Owner not reportedAZ, NM
Springerville345 kV173 km Owner not reportedNM, AZ
Springerville345 kV173 km Owner not reportedNM, AZ
Substation names not reported345 kV146 km Owner not reportedNM
Substation names not reported345 kV146 km Owner not reportedNM
Guadalupe345 kV145 km Owner not reportedNM
Luna345 kV137 km Owner not reportedNM
Guadalupe345 kV113 km Owner not reportedNM
Greenlee345 kV96.5 km Owner not reportedNM, AZ
Luna345 kV91.9 km Owner not reportedNM
Amrad345 kV91.2 km Owner not reportedTX, NM
Luna345 kV81.1 km Owner not reportedNM
Norton345 kV68.0 km Owner not reportedNM
Taos345 kV60.4 km Owner not reportedNM
Luna345 kV40.1 km Owner not reportedNM
West Mesa345 kV38.8 km Owner not reportedNM

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants